Site Construction Update: August 13, 2009

This construction update shows the progress that has been made since the last update!

Panorama 2 - INCLUDES 34, 35, 36This panorama shows the fill placement for the rail spur that will be alongside 84 Lumber’s new home.

Panorama 1 - INCLUDES 40, 41Notice the fill has now been placed halfway up the stormwater retention chamber.  Here is a closer look:

Newbury 041_717

An even closer panorama view:

Panorama 3 - INCLUDES 42, 43

Finally, the big picture.  This photo shows the progress that has been made with the stormwater system.  Notice the lifts of soil surrounding it.

Panorama  4- GOOD

Lastly, this photo was taken on the single family site.  It shows the construction of the interseptor channel.  The stormwater that accumulates here will run to the sediment basin.  This “shovel” is used to dig the interceptor channel.

Newbury 050_717

Here is a gallery of all the photos used in this blog entry (click on them to view the larger version).