September 24, 2009
|
Newbury is proud to release the third of its proposed new home plans, the Carriage Homes. The Carriage Homes will be built by both Stambrosky Homes and Deklawa Home. Stambrosky is also the builder of our Manor Homes, but we are proud to introduce you to Deklawa Home. Deklawa Home is a valued and respected […]
September 14, 2009
|
Since we have been double-shifting at Newbury, huge leaps have been made as far as progression at the site. In the below panorama, you can see they are starting to place lifts of compacted soil from the residential site onto building pads at the retail site. Notice the yellow truck, it’s an articulated truck, there […]
September 4, 2009
|
Since our last update, the stormwater retention structure at the 84 Lumber site has been completed, 100% filled with stone, as seen below. In addition, this blog update really shows the progress being made through both earthwork operations, 84 Lumber and the residential site drive is extending up toward the top of the hill. Wow, […]
September 1, 2009
|
These photos show the progress made since the last site update. Since receipt of the joint-permit, so much progress has been made at the Newbury site, both along the 84 Lumber portion and the residential portion! This photo shows where the fill will need to be placed at a location where a wetland existed and […]