November 20, 2009
|
Here we are with another construction update. This one will focus on building pads at the retail site to utility work up the residential site drive to some of the same ongoing earthwork on the residential site from the previous construction update! So we will be showing progress all the way up the hill. These […]
November 16, 2009
|
Our Fall Festival at the site was on a beautiful Sunday afternoon. It was an open event for the public to get and a first look at the site and where the homes are to be built! Two dump trucks, an excavator, a roller and a D6 bulldozer were part of the main attraction where […]
November 13, 2009
|
With our site contractor working double shifts (6am to midnight) Monday through Saturday, we continue to make excellent progress at Newbury. The ongoing earthwork operations are happening on the top of the residential hill area and the 84 Lumber site. There is also continued progress on the sanitary sewer line along the residential site drive! […]
November 11, 2009
|
This construction update for Newbury will show the real progress being made at the 84 Lumber site as well as the utility systems along the residential site drive! Here is the site map showing generally where the first half of the pictures were taken at the residential drive. (The pictures will be numbered so that […]
November 9, 2009
|
With weather starting to show us the first signs of Winter ahead within the last week, a lot of progress is left to be done before the Winter months actually begin! This is the site map! (You can view it larger in the gallery at the bottom of this post) *The numbers placed underneath the […]